UK-wide · Established 1968 · CE and UKCA marked

Steel fabricators for the whole of the United Kingdom.

Staircases, handrails, balustrades, canopies, flooring and stainless with glass — designed in AutoCAD, fabricated and trial-erected at our own works, then delivered and installed by our own team.

1968Established
25+Years using in-house CAD
100%Designed & fabricated in-house
One workshop, since 1968Nothing sub-let to another shop
Delivered & installed nationwideBy our own team, not a haulier
01782 561526Ask for Craig
CSCS accreditedEvery employee and sub-contractor
Glass balustrade and stainless steel handrail running along a first-floor landing with a maple floor

About Tri-Dev

Three engineers in 1968. A dedicated team ever since.

Tri-Dev was formed in 1968 by three engineers carrying out development work on machinery, predominantly for the pottery industry. Over the years the client base grew to cover automotive, mining, steel production and textiles.

Today the bulk of our work is quality fabrication for the building sector — architectural stairs, fire escapes, balustrades, handrails, canopies, flooring and specialist structures — with that engineering background still behind it.

Every design is produced electronically in AutoCAD, in-house, and discussed with you as it progresses. Final products are tested and trial-erected in-house before they ever reach site.

Recent work

A look at some of our current and recent work

Photographs of our own jobs, from the workshop and from site — tap any photo for a closer look.

See the full project gallery

Nationwide

Steelwork that travels

We are a single-works fabricator that installs the length of the country. That combination is the whole proposition — one team accountable from the first drawing to the last fixing.

Made in one place

Every job is drawn, cut, welded and trial-erected at the same works. There is no second fabricator in the chain and no variation in who did the work.

Delivered by us

Our own transport and our own team, so the steel arrives with people who know how it was built and what it has to meet on site.

Proved before it ships

Assemblies are tested and trial-erected in-house as required. On a job three hundred miles away, that is the difference between a fitting day and a return visit.

Distance changes the planning, not the standard. How we work on national jobs.

How we work

From idea to finished install, all in-house

01

Design & CAD

25+ years using in-house CAD — 2D or 3D drawings produced electronically in AutoCAD and refined with you as the design develops.

02

Fabrication

Built in-house by our dedicated team, to your specification and in accordance with the latest regulations and British Standards.

03

Testing

All products are tested and trial-erected in-house as required, before they’re ever installed on site.

04

Delivery & Install

Our own team delivers and installs the finished steelwork, anywhere in the UK.

Accredited

Checked, carded and marked

The paperwork a main contractor asks for before anyone sets foot on site.

  • CHAS Accredited
  • Committed to CSCS
  • PASMA - Prefabricated Access Suppliers' and Manufacturers' Association
  • IPAF - International Powered Access Federation
  • FSB - Federation of Small Businesses
  • CE and UKCA conformity marking

CE and UKCA marking, CHAS accreditation and CSCS cards for every employee and sub-contractor on site.

Health & Safety

Safety, monitored every day

We promote the importance of Health and Safety at our works and on site — not an afterthought, a daily discipline.

  • CSCS accreditation for every employee and sub-contractor on site
  • Workshop and site supervisors monitor safety daily to keep risk to a minimum

FAQs

Common questions, answered

A few of the questions we get asked most. See all FAQs.

Where do you work?

Across the whole of the United Kingdom. Fabrication is carried out at our own works in Staffordshire and our own team delivers and installs on site nationwide.

What do you make?

Staircases, handrails, balustrades, canopies, steel flooring, fire escapes, walkways, mezzanine floors, stainless with glass, and bespoke one-off metalwork. The range is deliberately broad.

How long has Tri-Dev been established?

Since 1968. We were formed by three engineers carrying out development work on machinery, and have built into structural and architectural fabrication since.

Do you handle design as well as fabrication?

Yes. We have used in-house CAD for 25+ years. Every design is produced electronically in AutoCAD, in 2D or 3D, and discussed with you as it progresses.

Talk it through

Speak to the right team, first time

Call Craig on 01782 561526, or email craig@tridev.co.uk. Email is answered around the clock; the works is open Monday to Friday, 8:00am to 4:30pm.

Call 01782 561526 Email Craig

Tri-Dev Ltd, Loomer Road, Chesterton, Newcastle-under-Lyme, Staffordshire, ST5 7LB